New Post 12/18/2009 1:15 PM
  JohnB
15 posts
7th Level Poster


How best to manage disruption in 2010 - suggestions? 

 

Recently, BlogTO posted an article on how Roncesvalles businesses are struggling during the reconstruction, a reminder of the importance of supporting local businesses during the holiday season. I urge all Roncesvalles residents, please, to brave the occasional dust blast (and chilly breeze), and drop by your local shops, services and restaurants. We need you now more than ever!
 
The article mentions several business closures, although it is not clear that all these closures were due to the reconstruction. What is certain, however, is that business is down, and the 30 percent drop that Len from Pollocks reported sounds typical for the street. Is there way of mitigating the disruption during the second phase of construction (to begin in the spring with the streetcar track and sidewalk repairs)?
 
In addition to urging continued local support for Roncesvalles businesses, the BIA would like to ask community members for their observations of how this first phase of construction has been managed. What can be done better to ensure that the second phase proceeds as smoothly as possible? Good suggestions should be incorporated into the tender document, which the City and TTC will send out shortly.
 
Here are my own observations, and a few suggestions:
 
1) Do more to ensure pedestrian movement: Quite often during the first phase, pedestrians were required to walk a block or more out of their way just to cross the street. This effectively cut off businesses from half their customers. The new contract should state that pedestrian crossings shall be maintained at each block except when this is absolutely impossible. Each hour that a pedestrian crossing was closed made a difference to businesses across the street.
 
2) Manage the dust: Far more than parking and car access, I personally would say that dust and noise were the main factors keeping customers (my customers at least) off the street. The jackhammers only lasted a week or so out front, but the dust remained far longer. This meant that whenever a bus drove by, a huge cloud of dust was stirred up and thrown into people's faces. Even after the first blast, micro particles would linger in the air, making the street unpleasant for everyone and intolerable for those with even mild allergies. I often noticed that several people would return to the street after it rained, most likely because the moist dirt did not throw up dust. I would urge the city to send out street cleaning vehicles regularly during the reconstruction to keep the dust under better control.
 
3) Contain the mess: Right now, there are several blocks along the street that are finished but are still closed off due to staging materials. Wherever possible, the City should insist that staging materials be kept on the same block where work is occurring or just one block adjacent. Whenever a block can be opened up, however partially, it should be.
 
4) Preserve bike parking: whenever bike posts must be removed in order to reconstruct the sidewalk, temporary bike parking should be provided nearby. Car traffic may need to be restricted along Roncesvalles, but there is no reason bike traffic or parking should be. By the way, in September, Roncesvalles Renewed member Mark Ellwood counted 194 bikes parked along Roncesvalles, compared to the average of 145 parked cars Mark observed in 2008 while completing his thoroughly-researched parking survey. Last August, traffic guru Tom Vanderbilt wrote in Slate about the importance of bike parking.

5) Accept time-based transfers at all Roncesvalles stops, allowing TTC riders forced to switch vehicles at Queen/King/Roncesvalles to shop a bit before resuming travel north without requiring use only at designated transfer locations. A similar program has been in place on St. Clair.
 
6) Bonuses for speedy completion of work built into the construction contract
 
Are there any other observations/suggestions? Please contact the BIA at info@roncesvallesvillage.ca or post below!
 
The community understands that the reconstruction work is absolutely necessary to avoid having streetcars run off their rails. And disruption is inevitable with any reconstruction. But there is always room for improvement in how such things are managed. Let's make sure the lessons learned during this first phase are incorporated into the second!
 
John Bowker
Parking and Beautification Chair
Roncesvalles Village BIA
www.roncesvallesvillage.ca
 
 
New Post 12/19/2009 4:18 PM
  Tamar-SoHo
2 posts
10th Level Poster


Re: How best to manage disruption in 2010 - suggestions? 

I think it should be managed better : In front of my store at the end of the summer, the street was closed for 2 weeks. NO work was done on my block but a small dirt pile, a few orange cones and one pipe.

 

If they are not working on a block , don't leave your pipes and dirt and move on to the next : take your pipe and dirt to the next block as you are already blocking it because of the work - so why block 2?

 
Disabled Previous
 
Next Next
  Forum  Discussions  Getting it Righ...  How best to manage disruption in 2010 - suggestions?

Discussion Policy

These Discussion Forums are dedicated to the discussion of the Roncesvalles Renewed project.

For the benefit of the community and to protect the integrity of the project, please observe the following posting guidelines:

1. No Advertising. This includes promotion of commercial and non-commercial products or services which are not directly related to Roncesvalles Renewed.
2. No Flaming or Trolling.
3. No Profanity, Racism, or Prejudice.
4. Site Moderators have the final word on approving/removing a thread or post or comment.